Oil & Gas Tenders
7,140 tenders in "Oil & Gas" category.
PERTAMINA EP | SHUG-2108B2A-A07
JASA FABRIKASI DAN PEMASANGAN HYDRAULIC CATHEAD UNTUK 3 UNIT RIG SERTA FABRIKASI 4 UNIT CYLINDER FUEL TANK CAP 2000 LITER DI PT. PERTAMINA HULU ROKAN ZONA 1 FIELD JAMBI
August 30, 2021 to September 03, 2021
ExxonMobil Cepu Limited | 038548R
Provision of Expatriate Formalities Services
August 30, 2021 to September 03, 2021
ExxonMobil Cepu Limited | 038548R
Provision of Expatriate Formalities Services
August 30, 2021 to September 03, 2021
ExxonMobil Cepu Limited | 038796R
Provision of Expatriate Relocation Services
August 30, 2021 to September 03, 2021
PERTAMINA EP | SHUH-211149A-A10
UPGRADING FIRE PROTECTION SYSTEM SPG PAGARDEWA PERTAMINA HULU ROKAN REGIONAL 1 ZONA 4 PRABUMULIH FIELD
August 30, 2021 to September 03, 2021
BOB PT. BSP – Pertamina Hulu | 041/PQ/10702 - 10703/WHS/2021l
Prakualifikasi Pengadaan PIPE
August 30, 2021 to September 01, 2021
PERTAMINA EP | SHUG-211210A-A07
Jasa Pengamanan Access Control di Lokasi PT Pertamina Hulu Rokan Zona 1 Lirik Field
August 27, 2021 to September 01, 2021
PERTAMINA EP | SHUN-2110B8A-A16
PENGADAAN WIRE ROPE 1"; 7/8"; DAN 3/8" UNTUK DRILLING LINE DAN RAISING LINE RIG LTO-350, KSF-01, & H-35 BUNYU FIELD
August 30, 2021 to September 03, 2021
PERTAMINA EP | EPPA-211219A-P23
KONTRAK PAYUNG SIPIL FASILITAS PRODUKSI DAN FASILITAS PENDUKUNG FIELD SANGATA PERTAMINA EP REGION 3 ZONA 9
August 27, 2021 to September 02, 2021
PT Medco E&P Malaka | CS15324
Wellhead & X-Mas Tree Services Block A
August 27, 2021 to August 31, 2021
PT Medco E&P Malaka | BS15611
Mixture Gas Calibration
August 30, 2021 to September 03, 2021
PT Pertamina EP Cepu | EPZ0-S21PQ0129A-CP4
Pengadaan Jasa Housekeeping dan Maintenance PT Pertamina EP Cepu selama 3 (tiga) Tahun
August 27, 2021 to August 31, 2021
PERTAMINA EP | SHUK-211217A-A13
PEKERJAAN JASA PENGELOLAAN WATER BASED MUD (POLYAMINE BASED) LENGKAP DENGAN PENYEDIAAN MATERIAL, PERALATAN DAN DRILLING FLUIDS ENGINEER UNTUK PEMBORAN
August 26, 2021 to September 01, 2021
Saka Indonesia Pangkah Limited | BID-21-0291
Provision Of Wellbore Clean Out Equipment and Services
August 26, 2021 to August 27, 2021
PERTAMINA EP | EPPA-211215A-P23
KONTRAK PAYUNG SIPIL FASILITAS PRODUKSI DAN FASILITAS PENDUKUNG FIELD SANGASANGA PERTAMINA EP REGION 3 ZONA 9
August 26, 2021 to September 01, 2021
PREMIER OIL NATUNA SEA B.V. | 21110206- OR
Provision of Lifeboat Inspection Maintenance Services
August 25, 2021 to August 30, 2021
BOB PT. BSP – Pertamina Hulu | 068-21-QHSE-PQ
Prakualifikasi Jasa Penyediaan Tenaga Kerja Untuk Membantu Operasi Departemen QHSE BOB PT. BSP – Pertamina Hulu
August 26, 2021 to August 30, 2021
PERTAMINA EP | SHUE-211200A-A05
PENGADAAN CASING HIGH GRADE DAN TUBING 13 CR DI PT PERTAMINA EP MELALUI TECHNICAL FRAMEWORK CONTRACT (TFC)
August 25, 2021 to August 30, 2021
PT Medco E&P Malaka | BS15802
H2S ANALYZER
August 27, 2021 to September 01, 2021
PT Medco E&P Indonesia | CS15507
Well Operations Technical Support Services
August 26, 2021 to August 31, 2021
